Following are the basic tips you should be remembered while working on construction sites:
1.GRADE OF CONCRETE:
- M5 - 1:4:8
- M10 - 1:3:6
- M15 - 1:2:4
- M20 - 1:1.5:3
- M25 - 1:1:2
2.CLEAR COVER TO MAIN REINFORCEMENT:
- Footings - 50mm
- Raft Foundation(Top) - 50mm
- Raft Foundation(Bottom) -75mm
- Raft Foundation(Side) - 75mm
- Beam - 25mm
- Strap Beam - 50mm
- Column - 40mm
- Slab - 15mm
- Flat Slab - 20mm
- Stair Case - 15mm
- Retaining Wall - 20 to 25mm
- Water Retaining Structures - 20 to 30mm .
- Maximum Water Absorption by bricks - 15%
- Compressive Strength of Bricks - 3.5 N/mm^2
- Density of Bricks - 1600 to 1920 Kg/m^
- Minimum Thickness of Slab - 125mm
- Dimension Tolerance for Cubes - +2
- Maximum Freefall of Concrete - 1.50m
- Laping should not be use for the bars having larger dia than 36mm
- Binding wire required for steel reinforcement - 8Kg per MT
- Maximum chair spacing - 1m
- Minimum dia should be ised in dowels rod - 12mm
- Hooks for Stirrups(1side) - 9D
- No.of.Stirrups=(clear span/spanning+1)
- Length of main steel in cantilever anchorage - 69D
- Minimum no.of bars in square column - 4
- Minimum no.of bars in circular column - 6
- Minimum dia of main bars and distributors in the slab - 1/8 of slab thickness.
All reinforcements should be free from mill scales,loose rust,and coats of paints,oil or anyother substances.
3.SETTING TIME:
- Initial setting time should not be less than 30minutes.
- Final setting time should not be greater than 10hours.
- Super Sulfate Cement - 7days
- Ordinary Portland Cement - 10days
- Cement with minerals and admixtures - 14days
- Lightly Reinforced Concrete - 25 to 75mm
- Heavily Reinforced Concrete - 75 to 100mm
- Trench Fill - 100 to 150mm(for in-situ & tremie)